Stainless Cable & Railing™
Pinterest
View Cart

FACTORY SWAGED ASSEMBLY FOR CABLE DECK RAILING SYSTEMS

FACTORY SWAGED ASSEMBLIESClick to enlarge
FACTORY SWAGED ASSEMBLIES
Item #SF-Fact-Assy
Base Price$18.89
Options
ASSEMBLIES INCLUDE:1 END SWAGED:
1ea Professional Swaging Service
1ea Field Swaged Teminal
1ea Factory Swaged Tensioner
(OR 2ea Tensioners)
2ea End Hardware as Chosen Above

BOTH ENDS SWAGED:
2ea Professional Swaging Service
1ea Factory Swaged Teminal
1ea Factory Swaged Tensioner
(OR 2ea Tensioners)
2ea End Hardware as Chosen Above
IMPORTANT:During Checkout, specify the number of cables in your run and their respective lengths in the comment section. If you are only having us swage one end, add six inches to your cable length. If both, provide the outside to outside measurements of your run within a quarter inch.
NOTE:CABLE SOLD SEPARATELY
:SWAGING TOOL REQUIRED IF ONLY ONE END IS SWAGED
AvailabilityUsually ships in 5-7 business days
Quantity
Send Page to Friend
Inserts through drilled holes in either wood or metal end posts and attaches with TERMINAL FITTINGS. Since the swaged body of the fittings remain hidden from view inside your posts, no swage marks can be seen like you see with other competitor railing systems. Just provide us with accurate post to post measurements and we will swage your cable runs using professional swaging machinery that produces the finest swaged fitting.
  • 11 assemblies needed for each cable run 36" high.
  • 13 assemblies needed for each cable run 42" high.
  • TIP: It's more economical to have longer cable runs that run continuously around corners so fewer fittings are needed.
"TWO TENSIONING ENDS" VARIATION ALLOWS TENSIONING ON BOTH ENDS OF THE CABLE. IDEAL FOR RUNS THAT ARE LONG OR OTHERWISE REQUIRE ADDITIONAL TENSIONING.

Parts and services needed to complete 1 assembly :

  1. 1x19 STAINLESS CABLE for straight runs and runs with slight bends or 7x7 STAINLESS CABLE for runs that have 90 degree corners.
  2. 1 FACTORY SWAGED THREADED TERMINAL + 1 FACTORY SWAGED THREADED TENSIONER
  3. Note: For all Assembly lengths >50'(70' max) and/or runs from 0-70' with more than 1 90 degree corner, use 2 FACTORY ASSEMBLY THREADED TENSIONER (instead of 1 FACTORY SWAGED THREADED TERMINAL + 1 FACTORY SWAGED THREADED TENSIONER), to allow cable tightening at both ends of your run.
  4. 2 CABLE QUICK NUT + 2 COVER or 2 ACORN NUT + 2 HEX NUT + 2 STAINLESS WASHER.
  5. PROFESSIONAL SWAGING SERVICE Priced per factory swage. Two swages per cable run.
Note: Stainless Steel is highly resistant, but not impervious to the elements, and requires minimal maintenance for ideal results. We recommend applying Citrisurf 77 Plus to all exposed stainless steel components at the time of installation. In addition, apply Boeshield T9 if within 10 miles of a marine environment to further protect the stainless steel. Learn more about these products and general stainless steel care on our Cleaning & Maintenance Page.

Need help designing your railing project or an estimate? Email drawings(non-technical OK) to us at: quotes@stainlesscablerailing.com and we will respond within 24 hours. See the WORKSHEETS tab for additional resources or just phone/fax us at 1-888-686-7245 (RAIL). We are happy to help!

Send us your completed
Cable Railing project photos for a
$25 Starbucks Gift Card!

  houzz interior design ideas arcat building product specifications and information
Stay In The Loop!Join our mailing list
VISA, MC, AMEX, PayPal accepted by Deck Railing Cable Rail Stainless Cable and Railing