Click on a FITTING to go to the item.
Mounting Thru Post Fittings:
- Pre-drill holes through the post.
- Swage the cable into the fitting, and pass it through the post, with the threads on the outside face of the post.
- Cut off additional threads (if tensionning end)
- install the end hardware.
Assemblies can be configured with one end that tensions and one that doesn't, for runs requiring 3 inches or less of tightening. You may also configure with both ends that tension for longer runs, requiring 6 inches of tightening.
TO ORDER
Most people will require either 11 or 13 cables for 36in or 42in high Top Rail respectively.
Use the images to the left to help decide how many starts and stops will be needed.